ROOF PIPE SUPPORT SYSTEMS
The Roof Pipe Support Systems are designed to support single or multiple pipes at any specified height or width. The supports are designed for installation without roof penetrations, flashings or damage to the roofing material, and can be used on virtually any roofing system - from flat roofs to sloped roofs, up to 2 in 12. The supports should be spaced according to the recommended specifications.
Seismic and High-Wind applications are also available for the system.
SS8-RL Low Profile - for pipe sizes up to 2-1/2" OD
|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 4 pounds Dimensions: 8"x 10"x 2-1/2" Height: 3 3/4" off roof, non-adjustable. HDG bolts, nuts and washers. For pipe sizes up to 2-1/2" OD
For more information, please go to: Design & Quote
|
 |
| |
Resources |
 |
|
| View |
Downloads |
Technical Resources |
SS8-RL Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to the design and layout.
- Layout SS8-RL supports per spacing specifications or PHP layout.
- Run pipe on roller.
Retro-fit
- Lift pipe, (enough to remove existing support).
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Put SS8-RL support on pad.
- Lower pipe onto roller.
Installation
SS8-RL Photos

Photos Design & Quote |
2-D CAD (40KB) 3-D View CAD (2760KB) 3-D PDF
|
Spec Sheet (PDF)
|
|
SS8-CL Low Profile - for pipe sizes up to 2-1/2" OD

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 4 pounds Dimensions: 8"x 10"x 2-1/2" Height: 3 3/4" off roof, non-adjustable. HDG bolts, nuts and washers. For pipe sizes up to 2-1/2" OD
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
SS8-CL Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to the design and layout.
- Layout SS8-CL supports per spacing specifications or PHP layout.
- Run pipe on channel.
- Clamp down with channel clamp, (provided by contractor).
Retro-fit
- Lift pipe, (enough to remove existing support).
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Put SS8-CL support on pad.
- Lower pipe onto channel.
- Clamp down with channel clamp, (provided by contractor).
Installation
Photos Design & Quot |
2-D CAD (39KB) 3-D View CAD (489KB) 3-D PDF
|
Spec Sheet (PDF)
|
|
SS8-C - for pipe sizes up to 2-1/2" OD

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 3 pounds Dimensions: 8"x 10"x 2-1/2" Height: Adjustable to 10" HDG or Stainless Steel threaded rods, nut and washers. For pipe sizes up to 2-1/2" OD
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
SS8-C Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to the design and layout.
- Layout SS8-C supports per spacing specifications or PHP layout.
- Run pipe on channel.
- Clamp down with channel clamp, (provided by contractor).
- Adjust channel until height and weight of system is evenly distributed.
Retro-fit
- Lift pipe, (enough to remove existing support).
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Put SS8-C support on pad.
- Lower pipe on channel.
- Clamp down with channel clamp, (provided by contractor).
- Adjust channel until height and weight of system is evenly distributed.
Installation
Photos Design & Quote |
2D CAD (39KB) 3D View CAD (488KB) 3D PDF
|
Spec Sheet (PDF)
|
|
SS8-R - for pipe sizes up to 2-1/2" OD

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 4 pounds Dimensions: 8"x 10"x 2-1/2" Height: Adjustable to 10"HDG or Stainless Steel threaded rods, nut and washers. For pipe sizes up to 2-1/2" OD
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
SS8-R Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to the design and layout.
- Layout SS8-R supports per spacing specifications or PHP layout.
- Run pipe on roller.
- Adjust roller height so weight of system is evenly distributed.
Retro-fit
- Lift pipe, (enough to remove existing support).
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Put SS8-R support on pad.
- Lower pipe onto roller.
- Adjust roller height so weight of system is evenly distributed.
Installation
Photos Design & Quote
|
2D CAD (40KB) 3D View CAD (2.76MB) 3D PDF
|
Spec Sheet (PDF)
|
|
PP10 with Roller - for pipe sizes up to 3-1/2" OD

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 6.5 pounds Dimensions: 10" x 16" x 3" Height: Adjustable HDG or Stainless Steel threaded rods, nuts and washers. For pipe sizes up to 3-1/2" OD
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
PP10 Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to design and layout.
- Layout PP10-R supports per spacing specification or PHP layout.
- Run pipe on roller.
- Adjust channel until height and weight of system is evenly distributed.
Retro-fit
- Lift pipe enough to remove existing support.
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Put PP10-R support on pad.
- Lower pipe onto roller.
- Adjust channel until height and weight of system is evenly distributed.
Installation
Photos Design & Quote
|
2D CAD (36KB) 3D View (2.83MB) 3D PDF
|
Spec Sheet (PDF)
|
|
PP10 with Channel - for pipe sizes up to 3-1/2" OD

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 5.5 pounds Dimensions: 10" x 16" x 3" Height: Adjustable HDG or Stainless Steel threaded rods, nut and washers. For pipe sizes up to 3-1/2" OD
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
PP10-C Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to design and layout.
- Layout PP10-C supports per spacing specification or PHP layout.
- Run pipe on channel.
- Clamp down with channel clamp, (provided by contractor).
- Adjust channel until height and weight of system is evenly distributed.
Retro-fit
- Lift piping enough to remove existing support.
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Put PP10-C support on pad.
- Lower pipe onto channel.
- Clamp down with channel clamp, (provided by contractor).
- Adjust channel until height and weight of system is evenly distributed.
Installation
Photos Design & Quote
|
2D CAD (34KB) 3D View (504KB) 3D PDF
|
Spec Sheet (PDF)
|
|
PP10 with Channel and Hanger - for pipe sizes up to 2-1/2" OD

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base with assembly 6 pounds Dimensions: 10" x 16" x 3" Height: Adjustable HDG or Stainless Steel threaded rods, nut and washers. For pipe sizes up to 2-1/2" OD
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
PP10-C/H Installation

New Pipe
- Layout isolation pads, (provided by contractor), according to the design and layout.
- Layout supports per spacing specifications or PHP layout.
- Run pipe through hanger opening.
- Adjust hanger height by turning nut at top of the channel, (clockwise-up; counter-clockwise-down).
- Make sure system is level and each support is supporting equal weight.
Retro-fit
- Remove top channel and hanger.
- Clean area where new support is to be placed.
- Place ISO pad, (provided by contractor).
- Place PP10-C/H supports under pipe.
- Replace channel on PP10-C/H support base.
- Put hanger around pipe.
- Hang the hanger back to the channel.
- Adjust hanger height by turning nut at top of channel, (clockwise-up; counter-clockwise-down).
- Make sure system is level and each support is supporting equal weight.
Installation
Photos Design & Quote
|
2D CAD (79KB) 3D View (660KB) 3D PDF
|
Spec Sheet (PDF)
|
|
PS-1-2 - for pipe sizes 2-1/2" and larger

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base, 3 pounds each Dimensions: 12" x 12" x 3", 18" x 18" x3", 18" Round Frames: Manufactured from B22TH 1-5/8" channel. Height: Adjustable HDG or Stainless Steel threaded rods, nuts and washers. Hot dipped galvanized roller, clevis or band hangers as specified. For pipe sizes 2-1/2" and larger
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
PS-1-2 Installation

- Layout isolation pads, (provided by contractor), according to the design and layout.
- Place bases on isolation pads.
- Insert the legs of pipe support into bases, (attach with 2-1/2” bolt and 1/2” nut).
- Space out pipe supports according to specifications. This should be done before any pipe is supported.
- IF BRACING IS REQUIRED, attach horizontal bracing to legs of pipe supports, (approximately 3/4” of the way up the height of the support), with 3” bolt and 1/2” nut.
NOTE: If double or triple bracing is required, designated locations will be marked on the support legs.
- Remove bottom half of clevis hanger.
- Insert insulation protection shield between bottom half of the hanger and insulated pipe.
- Reattach bottom half of hanger to top half of the hanger.
- Adjust height of hanger, so hanger is supporting piping. Adjust height of hanger by turning nut at top of allthread, (clockwise to raise, counter-clockwise to lower).
NOTE: Over adjusting will cause excess weight on support.
- Repeat step 9 on each support in the system, making sure the pipe and supports are level, both vertically and horizontally, and proper spacing is maintained per design specifications.
- Check that the weight of the pipe is distributed evenly throughout the system.
Installation
Photos Design & Quote
|
2D CAD (174KB) 3D View (2.71MB) 3D PDF
|
Spec Sheet (PDF)
|
|
PSE-2-2 - for pipe sizes 2-1/2" and larger

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base, 7 pounds each Dimensions: 18" x 18" x 3", 18" Round Frames: Manufactured from 1-5/8" B22TH channel and 1-7/8" BTS22TH channel .125-.250W when telescoped. Height: Adjustable HDG or Stainless Steel threaded rods, nuts and washers. Hot dipped galvanized roller, clevis or band hangers as specified. For pipe sizes 2-1/2" and larger (bare or insulated).
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
|
PSE-2-2 Installation

- Layout isolation pads, (provided by contractor), according to design layout.
- Place bases on isolation pads.
- Insert legs of pipe support into bases, (attach with 2-1/2” bolt and 1/2" nut).
- Space out pipe supports according to specifications. This should be done before any pipe is supported.
- IF BRACING IS REQUIRED, attach horizontal bracing to legs of pipe supports, (approximately 3/4” of the way up the height of the support), with 3” bolts and 1/2" nut.
NOTE: If double or triple bracing is required, designated locations will be marked on the support legs.
- Remove bottom half of clevis hanger.
- Insert insulation protection shield between the bottom half of the hanger and insulated pipe.
- Reattach bottom half of hanger to top half of the hanger.
- Adjust height of hanger so hanger is supporting piping. Adjust height of hanger by turning nut at top of allthread, (clockwise to raise, counter-clockwise to lower).
NOTE: Over adjusting will cause excess weight on support.
- Repeat step 9 on each support in the system making sure the pipe and supports are level, both vertically and horizontally, and proper spacing is maintained per design specifications.
- Check that weight of pipe is distributed evenly throughout the system.
Installation
Photos Design & Quote
|
2D CAD (183KB) 3D View (3.56MB) 3-D PDF
|
Spec Sheet (PDF)
|
|
PSE Custom - for pipe sizes-2 1/2" and larger

|
Pipe Support Product Description |
 |
 |
Bases: High Density Polypropylene Plastics and other additives for UV Protection. Weight: Base, 7 pounds each Dimensions: 18" x 18" x 3", 18" Round Frames: Manufactured from 1-5/8" B22TH channel and 1-7/8" BTS22TH channel .125-.250W when telescoped. Height: Adjustable HDG or Stainless Steel threaded rods, nuts and washers. Hot dipped galvanized roller, clevis or band hangers as specified. For pipe sizes 2-1/2" and larger (bare or insulated).
For more information, please go to: Design & Quote
|
 |
|
Resources |
 |
|
| View |
Downloads |
Technical Resources |
PSE Custom Installation

- Separate material per designated tag.
- Layout isolation pads, (provided by contractor), according to the design and layout.
- Place bases on isolation pads.
- Insert legs of pipe support into bases and attach with 2-1/2” bolt and 1/2" nut.
- Space out pipe supports according to specifications. This should be done before any pipe is supported.
- IF BRACING IS REQUIRED, attach horizontal bracing to legs of pipe supports, (approximately 3/4” of the way up the height of the support) with 3” bolts and 1/2" nut.
NOTE: If double or triple bracing is required, designated locations will be marked on support legs.
- Remove bottom half of clevis hanger.
- Insert insulation protection shield between the bottom half of the hanger and insulated pipe.
- Reattach the bottom half of hanger to the top half of the hanger.
- Adjust height of hanger so the hanger is supporting pipe. Adjust height of hanger by turning nut at top of allthread; clockwise to raise, counter-clockwise to lower.
NOTE: Over adjusting will cause excess weight on support.
- Repeat step 9 on each support in the system; making sure pipe and supports are level, both vertically and horizontally, and proper spacing is maintained per design specifications.
- Check that weight of pipe is distributed evenly throughout the system.
Installation
Photos Design & Quote
|
2D CAD (73KB) 3D View (3.44MB) 3D PDF
|
Spec Sheet (PDF)
|
|
|