Crossover System Installation
 |
Product Installation |
Resources |
CROSSOVER INSTALLATION
(WITH STAIRS ASSEMBLED)
- LAY OUT ISOLATION PADS ACCORDING TO FOOTPRINT OF CROSSOVER
- SET BASES ON TOP OF ISOLATION PADS
- PLACE EACH SET OF STAIRS IN BASES ACCORDING TO DIAGRAM
- PLACE PLANKING FOR CROSSOVER LANDING ON 1 ¾” B-B STRUT OF EACH SET OF STAIRS
- ATTACH PLANKING TO 1 ¾” B-B STRUT WITH HOLD DOWN CLIP
- SET INTERMEDIATE HANDRAILS ON INTERMEDIATE BRACKETS (ATTACH WITH 1” BOLT AND ½” SPRING NUT)
- SET TOP HANDRAIL ON TOP BRACKETS ( ATTACH WITH 1” BOLT AND ½” SRING NUT)
- MAKE SURE EVERYTHING IS TIGHTENED
CROSSOVER INSTALLATION
(WITH SUBSTRUCTURES)
- LAY OUT ISOLATION PADS ACCORDING TO FOOTPRINT OF CROSSOVER
- SET BASES ON TOP OF ISOLATION PADS
- PLACE SUBSTUCTURES IN BASES ACCORDING TO DIAGRAM
- FORM STAIRS FOR EACH SIDE OF CROSSOVER BY PLACING PLANKS BETWEEN EACH SET OF SUBSRUCTURES (ATTACH WITH HOLD DOWN CLIP)
- PLACE 1 ¾”B-B STRUT BETWEEN EACH SET OF SUBSTRUCTURES ON LANDING BRACKETS ( ATTACH WITH 1” BOLT AND ½” SPRING NUT)
- PLACE PLANKING FOR CROSSOVER LANDING ON 1 ¾” B-B STRUT OF EACH SET OF STAIRS
- ATTACH PLANKING TO TOP STRUT WITH HOLD DOWN CLIP
- SET INTERMEDIATE HANDRAILS ON INTERMEDIATE BRACKETS (ATTACH WITH 1” BOLT AND ½” SPRING NUT)
- SET TOP HANDRAIL ON TOP BRACKETS ( ATTACH WITH 1” BOLT AND ½” SRING NUT)
- TIGHTEN ALL NUTS, BOLTS, AND HOLD DOWNS
|
VIEW
Installation
Photos
Design & Quote
Spec Sheet
DOWNLOAD
back
|
|