CROSSOVER SYSTEM
Crossover System Installation
Crossover System
arrow Product Installation arrow Resources

CROSSOVER INSTALLATION

(WITH STAIRS ASSEMBLED)

  • LAY OUT ISOLATION PADS ACCORDING TO FOOTPRINT OF CROSSOVER
  • SET BASES ON TOP OF ISOLATION PADS
  • PLACE EACH SET OF STAIRS IN BASES ACCORDING TO DIAGRAM
  • PLACE PLANKING FOR CROSSOVER LANDING ON 1 ¾” B-B STRUT OF EACH SET OF STAIRS
  • ATTACH PLANKING TO 1 ¾” B-B STRUT WITH HOLD DOWN CLIP
  • SET INTERMEDIATE HANDRAILS ON INTERMEDIATE BRACKETS (ATTACH WITH 1” BOLT AND ½” SPRING NUT)
  • SET TOP HANDRAIL ON TOP BRACKETS ( ATTACH WITH 1” BOLT AND ½” SRING NUT)
  • MAKE SURE EVERYTHING IS TIGHTENED

CROSSOVER INSTALLATION

(WITH SUBSTRUCTURES)

  • LAY OUT ISOLATION PADS ACCORDING TO FOOTPRINT OF CROSSOVER
  • SET BASES ON TOP OF ISOLATION PADS
  • PLACE SUBSTUCTURES IN BASES ACCORDING TO DIAGRAM
  • FORM STAIRS FOR EACH SIDE OF CROSSOVER BY PLACING PLANKS BETWEEN EACH SET OF SUBSRUCTURES (ATTACH WITH HOLD DOWN CLIP)
  • PLACE 1 ¾”B-B STRUT BETWEEN EACH SET OF SUBSTRUCTURES ON LANDING BRACKETS ( ATTACH WITH 1” BOLT AND ½” SPRING NUT)
  • PLACE PLANKING FOR CROSSOVER LANDING ON 1 ¾” B-B STRUT OF EACH SET OF STAIRS
  • ATTACH PLANKING TO TOP STRUT WITH HOLD DOWN CLIP
  • SET INTERMEDIATE HANDRAILS ON INTERMEDIATE BRACKETS (ATTACH WITH 1” BOLT AND ½” SPRING NUT)
  • SET TOP HANDRAIL ON TOP BRACKETS ( ATTACH WITH 1” BOLT AND ½” SRING NUT)
  • TIGHTEN ALL NUTS, BOLTS, AND HOLD DOWNS