SS8-R
SS8-R w/Roller
SS8-R w/roller
arrow Product Installation arrow Resources

     

  1. All PHP Systems/Design systems are pre-assembled (no field assembly).
  2. Scrape off loose gravel, if gravel exists.
  3. Consult manufacturer of existing or new roofing system as to type of walk pads required for their roofing system.
  4. After pads are installed, place bases on pads.
  5. With all pipe supports in place, start at the beginning of the system and adjust each strut to achieve a balanced system.