- Lay out isolation pads.
- Put bases on isolation pads.
- Insert preassembled substructures into bases.
- Attach grating to substructures with hold-down clamps.
- Attach intermediate and top handrails, if provided.
|
VIEW
Installation
Photos
Design & Quote
Spec Sheet
DOWNLOAD
back
|